Sve prijave
barrage_displayed izvještaji
#122289: "Simone Luciani not able to sell multiple contracts with the Wind Farm building"
O čеmu је ovaј izvеštaј?
Što se desilo ? Molim vas odaberite ispod
Pravila: Pravilo igrе niје ispoštovano!
Detaljan opis
• Koji dio pravila nije primijenjen u BGA prilagodbi
According to Simone Luciani's ability I should be able to fulfill multiple contracts when producing, yet when producing with the wind farm I can only select one contract to fulfill• Da li je kršenje pravila vidljivo na ponovljenom snimku igre? Ako je odgovor da, na kom broju poteza?
It is preventing something from happening, move #257• Koјi је tvoј prеtraživač?
Google Chrome v124
Prijavite povijest
youdonotexist • Razvojni programeri još nisu reproducirali ovaj bug:
27. tra 2024. 1:38 • * f5 did not solve the problem
* This is the only time I've tried to do this
* Not sure how to convey this in a screenshot - only one contract is allowed to be selected
* This is the only time I've tried to do this
* Not sure how to convey this in a screenshot - only one contract is allowed to be selected
OrionHeart • Razvojni programeri još nisu reproducirali ovaj bug:
25. sij 2025. 10:37 • Bug is actually happening on game 617119789.
I left it on my turn where I can produce with wind farm and not do 2 green contracts.
I have been able to do 2 contracts in the same wind farm production the turn before but one was one of the starting ones.
I left it on my turn where I can produce with wind farm and not do 2 green contracts.
I have been able to do 2 contracts in the same wind farm production the turn before but one was one of the starting ones.
Dodaj nešto ovom izvješću
Dodajte ovdje sve što je relevantno kako bismo reproducirali ovaj bug ili razumjeli vaš prijedlog:
- Drugi stol / potez
- Je li problem rješen pritiskom na F5?
- Da li se problem pojavio više puta? Uvijek? Nasumično?
- Ako imaš print screen ove greške (dobra praksa), možeš da koristiš Imgur.com da bi je okačio, a zatim iskopiraj link ovde.